3,196,900 MMBtu
B/L loaded: 3,198,450 MMBtu - Transit loss: 1,550 MMBtu (0.048%) = 3,196,900 MMBtu
$14.72 /MMBtu
Avg(JKM, May-26) = $14.22 + premium $0.50 = $14.72/MMBtu
$47,038,408
3,196,900 MMBtu x $14.72/MMBtu = $47,038,408.00
-$296,930
(Outturn GHV 1,042 - Contract GHV 1,050) / 1,050 x 3,196,900 MMBtu x $14.72 = -$296,930.26
Deviation: -0.76%
Contract tolerance: +/- 1.0% — Within tolerance
-$1,080,000
(Actual: 96h - Allowed: 72h) x $45,000/hr = -$1,080,000.00
24h over laytime
Demurrage rate per SPA clause 12.1